Scope of Project: Building waste water lines, domestic water lines and rain water lines at additional AOSB area. Project includes constructing 1400 mm dimaeter steel pipe lines for 4 km, 1200 mm diameter and 10 km long koruge waste water lines, building of collector room and lift room, and buildıng 2000 mm diameter and 4 km long concrete rain water drain line.