Projects
- Customer:
- Contract No: SGE500-15-C-0004
- End Date: 25/02/2016
- Scope of Project: This was a design-build contract which included design, delivery and installation of 491 m2 prefabricated buildings c/w all interior electrical, mechanical and architectural installations for Border Guard Academy located at Almaty, Kazakhstan. Installation of electrical outlets, lighting fixtures, street light fixtures and poles, electrical panelboards, main feeder cable, fire alarm system, data and telephone outlets, CCTV system, doors, windows, floor covering, suspended ceiling, electrical radiators and air conditioners are some of works which have been performed under this contract. Also project consists of demolishing existing perimeter wall and construction of new 550 m concrete perimeter wall /w barbed wire, construction of new 1386 m2 asphalt pavement /w concrete borders, installation of new 150m main water line, construction of new concrete foundations for sliding gate and prefabricated buildings, installation of new 152m wire mesh perimeter fence and transportation and installation of PAS68 certified sliding gate, traffic barrier arms, traffic lights, 80 tons vehicle scale, X-ray scanner, turnstiles, and snow removal machine.
- 100%